Concept site — fictional business. Keystone Concrete Co. is a demo by Pocket Funnel. No real reviews, no real customers.
Flatwork · Weller County · Since 2004

What's it
going to
cost?

Fair question, and you shouldn't have to wait three days for a callback to get it. Ballpark your job right here, then book the free on-site measure — written quote inside two business days.

Measure
This week
Written quote
2 days
Workmanship
3 yr
(555) 442-9100 — answered, even when the crew is pouring

Ballpark it yourself

Sample ranges
1. What are you pouring?
720 sq ft
80a 2-car driveway ≈ 7001,600
3. Finish
Ballpark for this job
$5,750$8,650

A ballpark from typical broom finishpricing — not a quote. Access, grade, and what's under the old slab move it. The free measure is how you get a real, written number.

Book the free measure →

Measure to cure, start to finish

  1. 01

    Measure

    Free, ~30 minutes. We measure, check access and drainage, and talk through thickness and finish.

  2. 02

    Written quote

    Within two business days. Itemized: base, thickness, reinforcement, finish, joints, cleanup.

  3. 03

    Schedule

    You get a pour week, and a confirmed day once the forecast is close enough to trust.

  4. 04

    Prep & form

    Tear-out, grade, compacted base, forms set and checked for pitch. Usually a day.

  5. 05

    Pour & finish

    Early start. Pour, float, finish, and cut control joints the same day.

  6. 06

    Cure

    Walk on it in 24 hours, drive on it in 7 days. We come back and check it at 30 days.

What's under your slab

Driveways fail underneath.

Thin base, no compaction, joints cut too late — that's why the cheap bid spiderwebs in five years. Here's the spec we write into every quote, so you can hold the other bids next to it.

Base
4–6" compacted 21AA
Slab thickness
4" standard · 5–6" where trucks park
Mix
4,000 PSI, air-entrained for Michigan freeze-thaw
Reinforcement
Fiber mesh standard · rebar grid on structural
Control joints
Cut the same day, ~10 ft spacing
Warranty
3 years on workmanship (settlement, joint failure)
4" SLAB · 4,000 PSICOMPACTED 21AA BASEcontrol jointSUBGRADE, GRADED & PROOF-ROLLED

Get on the measure schedule

Thirty minutes in your driveway beats a week of phone tag. The estimator measures, checks the grade and access, answers the thickness-and-base questions, and you get an itemized written price within two business days.

  • Free — and free to say no
  • You meet the estimator, not a salesman
  • Itemized spec, not a one-line number
  • We'll tell you if you don't need a new pour

Book your on-site measure

Free, about 30 minutes, and you get the written quote within two business days.

Step 1 of 3
What are you pouring?
Why we answer at 7pm

You're calling three contractors. We're the one who picks up.

Concrete jobs go to whoever gets out to measure first. Our front desk answers after the crew goes home, scopes the job, and puts the measure on the calendar.

Keystonefront desk
Tuesday, 7:20pm — bid #3

A homeowner calls about a 900 sq ft driveway. Two other contractors went to voicemail.

  1. 1
    Tuesday, 7:20pm — bid #3

    A homeowner calls about a 900 sq ft driveway. Two other contractors went to voicemail.

  2. 2
    Answered after the crew went home

    The front desk picks up and asks the questions that actually price a job: size, tear-out, access.

  3. 3
    Scoped

    Tear-out of an old asphalt drive, standard broom finish, wants it before frost — noted for the estimator.

  4. 4
    Measure on the calendar

    Thursday 8am is booked and the estimator gets the details before they pull in the driveway.

Questions we get every week

Why won't you quote over the phone?+

We'll give you a ballpark over the phone all day — the estimator on this page does the same math. But the real number depends on access, grade, tear-out, and what's under there. We'd rather measure for 30 minutes than surprise you later.

How long does concrete take to cure?+

Walk on it the next day, drive on it after 7 days, park the heavy truck after 30. It keeps gaining strength for a month — the wait isn't us being cautious, it's chemistry.

Will it crack?+

Every slab cracks somewhere; the job is controlling where. That's what control joints are for. We cut them the same day at roughly 10-foot spacing, and our warranty covers joint failure and settlement.

Can you pour in the fall?+

Yes — up until the ground freezes, and we'll blanket a pour if a cold night lands wrong. What we won't do is pour on frozen base and hand you a slab that heaves by March.

Pour season fills up. Get measured this week.