Driveways, patios and slabs poured to a spec you can read. We measure on site, write the scope down, and tell you what the ground under it needs.
Other ways to reach us — the line is answered, even when the crew is pouring
Pick the closest one — the measure request opens with it already answered.
New, or tear out and replace what's cracking.
Start here →Broom, exposed aggregate or stamped finishes.
Start here →Including the footings underneath them.
Start here →The images on this page are AI-generated concepts of what a finished job could look like — not photographs of Keystone's work. A real customer's site uses their own approved photography.
Rough out the size and finish to get a ballpark before anyone comes out.
A ballpark from typical broom finish pricing — not a quote. Access, grade, and what's under the old slab move it. The free measure is how you get a real, written number.
Book the free measure →Base depth, compaction and joint timing are what decide whether a slab is still flat in ten years. Here is how we write it into a quote, so you can read it rather than take it on trust. The drawing below is illustrative — the right thickness, reinforcement, mix and cure for your job depend on the ground and what will sit on it, and they get written into your scope.
A real company's spec sheet ends with its workmanship warranty. Ask for it in writing, with what it covers and for how long. Keystone is a concept site, so it has none to give you.
Free, about 30 minutes on site. We measure, check access and drainage, and talk through thickness, base and finish.
Itemised: base, thickness, reinforcement, finish, joints and cleanup, so you can read it line by line rather than take it on trust.
Tear-out, grade, compacted base and forms checked for pitch, then the pour, the finish and the control joints. Curing depends on the mix and the weather, and we tell you what to expect for yours.
Thirty minutes in your driveway beats a week of phone tag. The estimator measures, checks the grade and access, answers the thickness-and-base questions, and you get an itemized written itemised price.
Free, about 30 minutes, and it ends with a written, itemised scope.
We'll give you a ballpark over the phone all day — the estimator on this page does the same math. But the real number depends on access, grade, tear-out, and what's under there. We'd rather measure for 30 minutes than surprise you later.
Walk on it the next day, drive on it after 7 days, park the heavy truck after 30. It keeps gaining strength for a month — the wait isn't us being cautious, it's chemistry.
Every slab cracks somewhere; the job is controlling where. That's what control joints are for. We cut them the same day at roughly 10-foot spacing — and whoever you hire, get the workmanship warranty in writing, with what it covers and for how long.
Yes — up until the ground freezes, and we'll blanket a pour if a cold night lands wrong. What we won't do is pour on frozen base and hand you a slab that heaves by March.